Private Wire Solutions
Explained
Direct electricity supply from dedicated generation to your data centre. Bypass grid constraints, reduce costs, and secure your energy future.
Optimal Sizing & Design
Our analysis uses 35-95% load coverage delivers the optimal balance of cost reduction and site integration, with 30% being the sweet spot.
Coverage Analysis
Why 30% is Optimal
Maximum Cost Reduction
Covers baseload demand while maintaining grid connection for peak requirements
Less Wh Mitigation
Covers baseload without expensive storage or peak shaving measures
Technical Efficiency
Optimal generator sizing maintains capacity use and fuel efficiency
Delivery Models
Choose the delivery model that best fits your risk profile and capital requirements.
Build Own Operate
Full ownership and control. We design, build and commission. You own and operate the asset.
- ✓ Complete asset ownership
- ✓ Maximum long-term savings/revenues
- ✓ Full operational control
Power Purchase Agreement
We build, own, and operate. You purchase power through a long-term contract with no capital required.
- ✓ No upfront capital
- ✓ Fixed-rate certainty
- ✓ Immediate cost savings
Hybrid Partnership
Joint venture with shared investment, risks, and returns over the life of the asset. Partnership model.
- ✓ Risk sharing partnership
- ✓ Revenue sharing model
- ✓ Balanced capital
Project Timeline
From site identification to power-on in 16-36 months depending on complexity.
Site Assessment
0-3 months
Planning & Permits
12 months
Construction
12-18 months
Commissioning
2-4 months